International Journal of Advanced Multidisciplinary Research and Studies
Volume 6, Issue 6, 2026
Examining the Effectiveness of Risk Management Processes on Project Performance: A Case Study of Lumwana Mining PLC
Author(s): Elizabeth
Abstract:
This study examined the effectiveness of risk management processes on project performance using Lumwana Mining PLC as a case study. The study focused on three specific objectives: to evaluate the current risk management processes adopted by Lumwana Mining PLC, to identify the most common risks affecting project performance, and to determine the effectiveness of existing risk management processes in improving performance outcomes. A descriptive research design was applied to gather data from a total of 75 respondents drawn from different departments including engineering, operations, finance, health and safety, and risk compliance. The respondents were selected through purposive and simple random sampling to ensure that both technical and administrative perspectives were represented. Data was collected using structured questionnaires which allowed for consistency and clarity in responses. Quantitative data were analyzed using descriptive statistics such as frequencies and percentages, while inferential analysis using Chi-square tests was conducted to assess relationships between key variables. The findings showed that Lumwana Mining PLC has established formal risk management processes, though their effectiveness varies across departments. About 53.33% of respondents stated that project risks are reviewed quarterly, while 77.33% confirmed that they have been directly involved in risk management activities. The most common risks identified were technical failures, safety incidents, and compliance-related risks, which frequently affect project timelines and cost control. The Chi-square results further revealed significant relationships between familiarity with the risk management framework and the perceived effectiveness of risk control. The study concluded that while risk management practices are in place, there is a need for improved communication, regular training, and stronger monitoring systems. It is recommended that Lumwana Mining PLC enhance cross-departmental coordination and increase employee involvement in risk assessment to achieve more consistent project performance.
Keywords: Risk Management, Project Performance, Lumwana Mining PLC, Risk Assessment
Pages: 1070-1079
Download Full Article: Click Here

