Delay in the Electric Pole Construction Project at the Units Electricity Project Implementation (UP2K) of PT XYZ South Sulawesi Region on Kalatoa Island, Pasilambena District, Selayar Regency



Author(s): Ahmad Padhil, Muhammad Fachry Havid, Dirgahayu Lantara, Nurul Khudah

Abstract:

The Electricity Project Implementation Unit (UP2K) is one of the units at PT XYZ for the South Sulawesi Region which is fully responsible for the implementation of the electricity pole construction project on Kalatoa Island, Pasilambena District, Selayar Regency. This project experienced delays in its implementation, for this reason this study aims to identify the causes of project delays and as a proposal to improve project delays using the Critical Path Method (CPM). The results of this study note that the cause of the delay in the construction project for the Kalatoa Island electricity pole, kec. Pasilambena, Kab. Selayar due to the difficulty of access to the location. This was identified in the fourth activity, namely the delivery of materials from Makassar to locations that experienced delays. So the proposed improvement for the delay in the construction project for the Kalatoa Island electricity pole, Pasilambena District, Selayar Regency with project scheduling using the CPM method. Where with this method results are obtained for 87 calendar days with an acceleration of time for 3 days from a predetermined schedule.


Keywords: Project Delay, Power Pole Construction Project, Critical Path Method (CPM)

Pages: 772-778

Enter your details to download article